Below are the lane closures for ongoing Florida Department of Transportation construction projects in the City of Hollywood.
I-95 from south of Hollywood Boulevard in the City of Hollywood to south of Broward Boulevard in the City of Fort Lauderdale and I-595 from I-95 to SR-7 in the Town of Davie (95 Express Phase 3C)
Description: Work on this 9-mile 95 Express project includes extending the existing Express Lanes north from just south of Hollywood Boulevard to just south of Broward Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Other project improvements include construction of I-95/I-595 Direct Connectors between 95 Express Lanes and I-595, as well as reconstruction, milling, resurfacing and widening of I-595 from SR-7 to I-95 and along I-95 from south of Hollywood Boulevard to south of Broward Boulevard. Additional work includes bridge widening along I-95 at several locations, painting of 17 bridges within project limits, I-95/SR 84 interchange modifications, Integrated Intelligent Transportation System (ITS) Installation, including cameras, detectors and dynamic message signs to optimize traffic operations, tolling/gantry construction, ramp signalization implementation at the interchanges, lighting, signage and drainage installation and construction of shoulder–mounted sound walls and retaining walls. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (954) 299-6561 or apacini@corradino.com.
Cost/Completion: $457 million/ late 2024.
Traffic Impact:
I-95 Traffic Impact:
· I-95 in each direction, from Griffin Road to south of Davie Boulevard, will have two lanes closed, nightly as needed, Monday through Thursday. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m.
· I-95 from Griffin Road to South of Davie Boulevard, will have shoulder closures daily and nightly as needed.
I-595 Traffic Impact:
· I-595 in each direction, from east of SR-7 to Anglers Avenue, will have two lanes closed nightly as needed, Monday through Thursday. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m.
· I-595, from I-95 to SR-7, will have shoulder closures daily and nightly as needed.
· The outside lane along southwest 30th Avenue, from Marina Mile Boulevard to 32nd Street, will be closed 10 p.m. until 5 a.m., Monday through Thursday.
Ramp Impact:
· The I-95 northbound exit ramp to I-595 westbound, from the I-95 ramp entrance to Anglers Avenue, will have the inside lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
· The I-95 southbound exit ramp to I-595 westbound, from south of SR-84 to Anglers Avenue, will have the outside lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
· I-95 southbound to the I-595 exit ramp, from the ramp entrance to south of SR-84, will have one lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
· The I-595 westbound to the I-95 northbound entrance ramp, from south of SR-84 (SW 32nd Street) to north SR-84 (SW 25th Street), will have one lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
· The SR 84 eastbound ramp, under the I-595 eastbound and westbound bridge, will have one lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
· The SR 84 westbound ramp, from SR 441 to Canal Drive, will have one lane closed, 10 p.m. until 5 a.m., Monday through Thursday.
- I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale (95 Express Phase 3A-1)
Description: Work on this 6.7-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other work includes: widening bridges, sound wall construction, installation of Intelligent Transportation System (ITS) and tolling equipment and ramp signaling at the I-95 entrance ramps at Davie Road, Broward Boulevard, Sunrise Boulevard, Oakland Park Boulevard and Commercial Boulevard. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini (954) 299-6561 or apacini@corradino.com.
Cost/Completion: $150 million / early 2021.
Traffic Impacts:
- I-95 Northbound Full Closure Advanced Notice: I-95 northbound lanes at Commercial Boulevard will be closed to traffic overnight, 11:30 p.m. until 5:30 a.m., Monday, February 17 and Wednesday, February 19 (Thursday night, February 20 will be a contingency night) for overhead sign structure installation. Traffic will be detoured via the I-95 northbound exit ramp to Commercial Boulevard, North Andrews Avenue and Cypress Creek Road. FHP will be on site to assist motorists. Please see detour flyer attached.
- I-95 Southbound Full Closure Advanced Notice: I-95 southbound lanes at Cypress Creek Road will be closed to traffic overnight, 11:30 p.m. until 5:30 a.m., Tuesday night, February 18 (Thursday night, February 20 will be a contingency night) for overhead sign structure installation. Traffic will be detoured via the I-95 southbound exit ramp to Cypress Creek Road , North Andrews Avenue and Commercial Boulevard. FHP will be on site to assist motorists. Please see detour flyer attached.
- I-95 will have three lanes closed in each direction, 9 p.m. until 5 a.m. Monday through Thursday. The first two lanes will close at 9 p.m., and the third lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m.
- I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly.
- Powerline Road at I-95 will undergo a full nightly closure, 10 p.m. until 5 a.m., Monday night, February 3 through Thursday night, February 13. Traffic will be detoured via Commercial Boulevard, N. Dixie Highway and Oakland Park Boulevard.
- Commercial Boulevard will undergo a full nightly closure, 10 p.m. until 5 a.m., Monday night, February 3 through Thursday night, February 6. Traffic will be detoured via North Dixie Highway, Oakland Park Boulevard and Powerline Road.
- Oakland Park Boulevard at I-95 will undergo a full nightly closure for bridge construction, 10 p.m. until 5 a.m., Sunday through Thursday nights, beginning Monday, February 3 through Thursday, February 13. Traffic will be detoured via Powerline Road, NW19th Street, Sunrise Boulevard and NW 21st Avenue. FHP will be on site to assist motorists.
- Advanced Notice: NW19th Street at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Sunday through Thursday nights, beginning Monday, February 10 through Thursday, February 20. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and NW 21st Avenue. FHP will be on site to assist motorists.
- Advanced Notice: NW 38th Street at I-95 will undergo a full nightly closure, 10 p.m. until 5 a.m., Monday, February 24 through Thursday, February 27. Traffic will be detoured via NW 10th Ave, Prospect Road and Andrews Avenue. FHP will be on site to assist motorists.
- Powerline Road at the I-95 overpass will have one lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.
- NW 19th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday.
- I-95 northbound, between Sunrise Boulevard and Oakland Park Boulevard has a new traffic pattern to allow for outside shoulder construction. This pattern is anticipated to be in place through April 2020, weather permitting.
- NW 6th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 4 p.m., Monday through Friday.
- Oakland Park Boulevard at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Monday through Friday.
- Broward Boulevard at I-95 will have one outside lane closed, nightly, 10 p.m. until 5 a.m., Tuesday, February 4 through Thursday, February 6.
Ramp Impact:
- The I-95 northbound entrance ramp from Oakland Park Boulevard will be closed, nightly, as needed, 9 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Commercial Boulevard and Powerline Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramps to Oakland Park Boulevard will be closed as needed 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to Commercial Boulevard will be closed as needed, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via I-95 and Cypress Creek Road. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from Commercial Boulevard will be closed, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Powerline Road and Cypress Creek Road. FHP will be on site to assist motorists.
- The I-95 southbound exit ramp to Commercial Boulevard will be closed nightly, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramps from Commercial Boulevard will be closed, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5 a.m.,Monday through Thursday. Traffic will be detoured via Powerline Road and Sunrise Boulevard. FHP will be on site to assist motorists.
- The I-95 southbound exit ramp to Oakland Park Boulevard will be closed, as needed, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via I-95 and Sunrise Boulevard. FHP will be on site to assist motorists.
- The I-95 northbound exit ramps Sunrise Boulevard will be closed, 10 p.m. until 5 a.m., Monday through Thursday.Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from Sunrise Boulevard will be closed, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Oakland Park Boulevard and Powerline Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramps from Sunrise Boulevard will be closed nightly, 10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
- The I-95 southbound exit ramp to Sunrise Boulevard will be closed nightly,10 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via Broward Boulevard and I-95. FHP will be on site to assist motorists; consecutive ramps will not be closed at the same time.
- The I-95 northbound exit ramp to Broward Boulevard will be closed nightly, 10 p.m. until 5 a.m., Monday night, February 3 through Thursday night, February 6. Traffic will be detoured via I-95 and the Broward Park & Ride. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from Davie Boulevard will be closed nightly, 10 p.m. until 5 a.m., Monday night, February 3 through Thursday night, February 6. Traffic will be detoured via State Road 7 and Broward Boulevard. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to eastbound Oakland Park Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.
- The I-95 northbound exit ramp to Commercial Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday.
- The I-595 to I-95 northbound ramp will have one outside lane closed nightly, 10 p.m. until 5 a.m., Tuesday, February 3 through Thursday, February 6.
- I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1)
Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or apacini@corradino.com.
Cost/Completion: $102 million / spring 2022.
Traffic Impact:
- I-95 will have three lanes closed in each direction nightly, between SW 10th Street and Glades Road, as needed,Monday through Thursday, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m.
- Advanced Notice: I-95 northbound lanes at Hillsboro Boulevard will be closed to traffic overnight, 11:30 p.m. until 5 a.m., Sunday night, February 16 for a traffic shift and new roadway construction. Traffic will be detoured via the I-95 northbound exit ramp to Hillsboro Boulevard west, Military Trail and Palmetto Park Road. FHP will be on site to assist motorists. Please see detour flyer attached.
- Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Monday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.
- Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.
- Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.
- Advanced Notice: Eastbound Palmetto Park Road at I-95 will undergo a full overnight closure for new bridge construction, 11 p.m. until 5 a.m., Monday night, February 10 and Tuesday night, February 11. Traffic will be detoured via I-95 and Hillsboro Boulevard. Law Enforcement Officers will be on site to assist motorists.
- Advanced Notice: Westbound Palmetto Park Road at I-95 will undergo a full overnight closure for new bridge construction, 11 p.m. until 5 a.m., Wednesday night, February 12 and Thursday night, February 13. Traffic will be detoured via I-95 and Glades Road. Law Enforcement Officers will be on site to assist motorists.
Ramp Impact:
- The I-95 northbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via I-95 northbound, Hillsboro Boulevard, and Military Trail. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
- The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.
- The I-95 southbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Military Trail and SW 10th Street. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from westbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Military Trail and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to eastbound Hillsboro Boulevard will be closed nightly, 11 p.m. until 5 a.m., Monday through Thursday. Motorists will be detoured via Palmetto Park Road and South Dixie Highway. FHP will be on site to assist motorists. Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.