News Flash Home
The original item was published from 12/23/2019 9:05:55 AM to 12/26/2019 3:59:29 PM.

News Flash

Home - City Spotlight

Posted on: December 19, 2019

[ARCHIVED] FDOT Traffic Impact Report for Hollywood - December 19 through December 27, 2019

Traffic Construction Updates

Below are the lane closures for ongoing Florida Department of Transportation construction projects in the City of Hollywood. 

  1. I-95 from south of Hollywood Boulevard in the City of Hollywood to south of Broward Boulevard in the City of Fort Lauderdale and I-595 from I-95 to SR-7 in the Town of Davie (95 Express Phase 3C)

Description: Work on this 9-mile 95 Express project includes extending the existing Express Lanes north from just south of Hollywood Boulevard to just south of Broward Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. The number of General Use lanes will remain the same. Other project improvements include construction of I-95/I-595 Direct Connectors between 95 Express Lanes and I-595, as well as reconstruction, milling, resurfacing and widening of I-595 from SR-7 to I-95 and along I-95 from south of Hollywood Boulevard to south of Broward Boulevard. Additional work includes bridge widening along I-95 at several locations, painting of 17 bridges within project limits, I-95/SR 84 interchange modifications, Integrated Intelligent Transportation System (ITS) Installation, including cameras, detectors and dynamic message signs to optimize traffic operations, tolling/gantry construction, ramp signalization implementation at the interchanges, lighting, signage and drainage installation and construction of shoulder–mounted sound walls and retaining walls. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (954) 299-6561 or apacini@corradino.com.

Cost/Completion: $457 million/ late 2024.

Traffic Impact: 

To minimize impact to the traveling public, lane closures are not permitted Tuesday, December 24, 2019 through Sunday, January 5, 2020.


I-95 Traffic Impact: 


  • Advanced Notice: I-95 in each direction, from Griffin Road to south of Davie Boulevard, will have two lanes closed, nightly as needed, Sunday through Thursday, beginning Sunday, January 5. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m.


  • Advanced Notice: I-95 from Griffin Road to South of Davie Boulevard, will have shoulder closures daily and nightly as needed, beginning Sunday, January 5.


I-595 Traffic Impact:

Advanced Notice: I-595 in each direction, from east of SR-7 to Anglers Avenue, will have two lanes closed, nightly as needed, Sunday through Thursday, beginning Sunday, January 5. The first lane will close at 9:30 p.m., and the second lane will close at 10 p.m. until 5 a.m. All lanes will be open by 5:30 a.m.


Advanced Notice: I-595, from I-95 to SR-7, will have shoulder closures daily and nightly as needed, beginning Sunday, January 5.


Ramp Impact: 

  • The I-95 northbound ramp to I-595 westbound, from I-95 northbound to Anglers Avenue, will have one lane closed 10 p.m. until 5 a.m., Sunday, December 22 and Monday, December 23.
  • The I-95 southbound ramp to I-595 westbound, from south of SR-84 to Anglers Avenue, will have one lane closed 10 p.m. until 5 a.m. Sunday, December 22 and Monday, December 23.
  • I-95 southbound to the I-595 exit ramp, from the ramp entrance to south of SR-84, will have one lane closed 10 p.m. until 5 a.m., Sunday, December 22 and Monday, December 23.
  • I-595 westbound to the I-95 northbound entrance ramp, from south of SR-84 (SW 32 Street) to north SR-84 (SW 25 Street), will have one lane closed, 10 p.m. until 5 a.m., Sunday, December 22 and Monday, December 23.
  • Advanced Notice: The I-95 northbound exit ramp to I-595 westbound, from the I-95 ramp entrance to Anglers Avenue, will have the inside lane closed, 10 p.m. until 5 a.m., Sunday through Thursday, beginning Sunday, January 5.
  • Advanced Notice: The I-95 southbound exit ramp to I-595 westbound, from south of SR-84 to Anglers Avenue, will have the outside lane closed, 10 p.m. until 5 a.m., Sunday through Thursday, beginning Sunday, January 5.
  • Advanced Notice: The I-95 northbound ramp to I-595 westbound, from I-95 northbound to Anglers Avenue, will have one lane closed 10 p.m. until 5 a.m., Sunday through Thursday, beginning Sunday, January 5.
  • Advanced Notice: The I-95 southbound ramp to I-595 westbound, from south of SR-84 to Anglers Avenue, will have one lane closed 10 p.m. until 5 a.m. Sunday through Thursday, beginning Sunday, January 5.
  • Advanced Notice: I-95 southbound to the I-595 exit ramp, from the ramp entrance to south of SR-84, will have one lane closed 10 p.m. until 5 a.m., Sunday through Thursday, beginning Sunday, January 5.
  • Advanced Notice: I-595 westbound to the I-95 northbound entrance ramp, from south of SR-84 (SW 32nd  Street) to north SR-84 (SW 25th Street), will have one lane closed, 10 p.m. until 5 a.m., Sunday through Thursday, beginning Sunday, January 5.

  1. I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale (95 Express Phase 3A-1)

Description: Work on this 6.7-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other work includes: widening bridges, sound wall construction, installation of Intelligent Transportation System (ITS) and tolling equipment and ramp signaling at the I-95 entrance ramps at Davie Road, Broward Boulevard, Sunrise Boulevard, Oakland Park Boulevard and Commercial Boulevard. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini (954) 299-6561 or apacini@corradino.com. 

Cost/Completion: $150 million / early 2021.

Traffic Impacts: 

  • Traffic restrictions will resume on Sunday night, January 5, 2020.

 

  1. I-95 from south of SW 10th Street in the City of Deerfield Beach to south of Glades Road in the City of Boca Raton (95 Express Phase 3B-1)

Description: Work on this 4.8-mile 95 Express project includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other project improvements include bridge widenings at Palmetto Park Road and Camino Real, complete bridge replacement at the Hillsboro Canal, noise wall construction, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, ramp signaling at the I-95 entrance ramps from Palmetto Park Road, Express Lane markers and landscape relocation. For more information, please contact I-95 Community Outreach Specialist Andrea Pacini at (561) 214-3358 or apacini@corradino.com.

Cost/Completion: $102 million / spring 2022.

Traffic Impact: 

  • Traffic restrictions will resume on Sunday night, January 5, 2020.

Facebook Twitter Email

Other News in Home - City Spotlight

Take the Survey Online

Community Development Community Survey

Posted on: August 18, 2023
Also in the Spotlight sm.jpg

Learn More on City Initiatives

Posted on: December 6, 2022
MAP Broward

Hollywood Is On The Map!

Posted on: February 9, 2022
Bicycle Mobility Plan

Bicycle Mobility Master Plan

Posted on: August 11, 2021
Strategic Planning process graphic

Strategic Plan for the Future

Posted on: January 26, 2020