On May 1, 2023, Weekley Asphalt Paving, Inc. will begin construction of intersection improvements at Johnson Street, Dixie Highway, Florida East Coast (FEC) Railway, and N 21st Avenue in Hollywood. Improvements include the replacement of the existing span wire traffic signal system with mast arms, milling and resurfacing, ADA compliant pedestrian ramps and crosswalks, and signing and pavement markings. During construction temporary lane closures will be necessary. Work is expected to be completed by October 2023.
Contractor personnel and inspection staff will work closely with residents and businesses in the construction area to minimize impacts caused by the project.

Points of Contact for Concerns or Emergencies:
Construction Engineering and Inspection – Metric Engineering, Inc.
- Mauricio Pinzon, CEI Project Administrator, (954) 533-7319 or mauricio.pinzon@metriceng.com
- Peter J. Medico, PE, CEI Senior Project Engineer, (954) 654-9124 or peter.medico@metriceng.com
Broward County Highway Construction and Engineering Division
- Carolina Vargas, P.E., Project Manager, (954) 577-4572 or cvargas@broward.org