How long will it take to issue my permit?
Pursuant to the Florida Building Code, processing of permits is performed within a maximum of 30 working days after the plans and / or specifications are submitted and are reviewed in date order. When the application is approved, the Building Division shall notify the applicant that a permit is ready for issuance. If the application is rejected, the Building Division will notify the applicant that additional information or corrections may be required. This period does not include review time for Planning and Zoning, Engineering, and Fire Departments.

Please note that all resubmitted plans with corrections / or changes are also subject to the maximum 30 working days and are re-reviewed in date order.

Show All Answers

1. When do I need to get a building permit?
2. How do I apply for a permit?
3. Can I apply for an Owner-Builder Permit?
4. As a contractor, what documents are required to register with the city?
5. How long will it take to issue my permit?
6. Can I make changes to my permit after it has been issued?
7. How do I obtain a Certificate of Occupancy or a Certificate of Compliance?
8. Do I have to display my permit card?
9. Can I replace my screen with impact windows and doors?
10. Do I need a Soil Bearing Certificate for my addition?
11. Do I need approval from my Homeowner's Association (HOA)?
12. Do I need to install smoke detectors in my existing house when doing an addition?
13. Do I need a permit to enclose a patio or carport with an existing roof?
14. Do I need a permit to replace my fence with the same fence?
15. Does my Building Permit expire?
16. Does my permit application expire if not issued?
17. Do I need a permit to replace my screen enclosure?
18. Do I need to register the alarm with the Sheriff's Department?
19. Is there a fee for the burglar alarm registration?
20. How do I make changes to my permit while it is still under review?
21. Do my plans need to be signed and sealed by an Architect / Engineer?
22. How many copies are required?
23. How do I know if my contractor obtained a Building Permit?
24. If I file a special inspector form, why can't the City inspector do my inspection?
25. Is a permit still required for a wireless alarm / battery operated alarm?
26. What Building Code is used in the City of Hollywood?
27. When do I need a tree permit?
28. What documents do I need to obtain a permit for additions / renovations?
29. Do I need a permit to do landscaping?
30. What signatures are required on my application?
31. Why do I need an electrical permit when enclosing my patio?
32. Why do I need to electrically bond metal located near the edge of a swimming pool?
33. Why do I need an electrical permit if I am only installing a fan, outlet or switch?